Section-11, Block-D, Main Road-3, Plote-22, Pallabi, Mirpur, Dhaka-1216
+88 01771-058768 aftab_rony@yahoo.com
Back to Main Website & Projects
Landmark Government Project • Bangladesh Marine Academy

Pabna Marine Academy – Campus Network, Fiber Backbone & Server Migration

Turnkey campus-wide optical fiber backbone deployment, OLT/ONU gigabit terminal configuration, central server software commissioning, and high-availability power infrastructure executed and delivered within 1 month for Bangladesh Marine Academy Pabna.

View Field Photo Gallery (4 Photos) Technical Architecture & Execution
100% Campus Fiber Coverage
1 Month Rapid Turnaround (Oct 2025)
2 & 5 Core Armored Optical Fiber
OLT / ONU High-Speed FTTH Architecture
99.9% Server & Power Uptime SLA
Institution / Client

Bangladesh Marine Academy Pabna

Department of Shipping, Ministry of Shipping
Project Timeline

October 2025 – October 2025

✓ 100% Completed on Schedule
Lead Project Engineer

Masba Uddin Rumi

Head of IT Infrastructure, Circle 21 Innovation
Contractor Authority

Circle 21 Innovation PVT LTD

Enlisted Govt Contractor (BPDB & Marine)
Engineering Architecture & Methodology

Comprehensive Scope of Engineering Execution

Circle 21 Innovation PVT LTD provided end-to-end design, civil conduit laying, optical fusion splicing, network switching, and server software deployment across Bangladesh Marine Academy Pabna.

1. Multi-Building Optical Fiber Backbone (2-Core & 5-Core)

Designed and implemented a ruggedized optical fiber distribution loop linking administrative headquarters, faculty offices, cadet academic blocks, and navigational training facilities. Deployed armored 2-core and 5-core optical fiber cables within impact-resistant conduits to ensure zero physical signal interference, moisture immunity, and low optical loss across extended campus distances.

Armored Fiber Cabling 2-Core & 5-Core Media Inter-Building Trunk Zero EMI Interference

2. OLT / ONU Configuration & FTTH Terminal Termination

Engineered and configured the central Optical Line Terminal (OLT) and distributed Optical Network Units (ONU). Executed high-precision optical fiber splicing and ONU termination at key campus nodes. Implemented dynamic bandwidth allocation (DBA), granular Quality of Service (QoS), and segregated VLANs to prioritize simulator telemetry and administrative database operations.

OLT Core Setup ONU Termination Gigabit Throughput VLAN Security Segregation

3. Central Server Systems & Software Package Deployment

Commissioned the central server workstation tower and deployed mission-critical academic and administrative software packages. Configured local directory services, campus internal intranet, secure firewall packet filtering, and automatic data backup routines to support daily institutional workflows, student examinations, and cadet records.

Central Workstation Server Software Deployment Academic Intranet Firewall Protection

4. Dual UPS Power Redundancy & Toten Rack Enclosure

To prevent data corruption and network outages during power grid fluctuations, we engineered dual uninterruptible power supply (UPS) units—featuring an Apollo Smart UPS and a TRM High-Density unit. The system is protected inside a lockable, wall-mounted Toten 19" enterprise rack with active ventilation and transparent inspection panels.

Toten 19" Wall Rack Apollo Smart UPS TRM High-Density UPS Zero Voltage Drop

Core Engineering Competencies & Equipment Matrix

Domain / Function Specification / Equipment Delivery Milestone
Optical Fiber Infrastructure Armored 2-core and 5-core multi-mode/single-mode outdoor trunking ✓ Completed & Verified
Terminal Configuration OLT core chassis & multi-building ONU termination endpoints ✓ Commissioned
Enclosure & Structural Toten 19" heavy-duty wall-mounted glass-front equipment rack ✓ Fully Installed
Backup Power Engineering Dual-redundant Apollo & TRM uninterruptible power systems ✓ Load Tested
Server & Software Layer Custom high-compute server tower with academic software suite ✓ Operational Handover
Institutional Readiness Delivered within strictly contracted 30-day turnaround (Oct 2025) ★ On-Time Milestone
Official Statutory Enlistment

Validated Institutional Partner for Bangladesh Maritime Academies

This landmark execution at Bangladesh Marine Academy Pabna exemplifies Circle 21 Innovation's official enlistment with the Department of Shipping Bangladesh, Bangladesh Marine Academy Pabna, Marine Academy Rangpur, Marine Academy Barishal, and the National Maritime Institute CTG. Our leadership combines master maritime officers and enterprise IT infrastructure architects.

View All 10 Enlistments

Require Campus-Wide Network & Server Infrastructure?

From multi-building fiber optic trunking to OLT/ONU FTTH distribution and centralized server rooms, partner with Circle 21 Innovation PVT LTD.

Request Institutional Quotation Call Chairman: +88 01771-058768